Visitors


Profile Visitor Map - Click to view visits

Saturday, November 29, 2008

Cab Mounts part 2

Paper template

Lay it out

Plasma cut them
Tack them

Weld them

Tuesday, November 25, 2008

Cab Mounts part 1

Cab mount parts 1" od x 1/2" id DOM
3/16" thick

TIG Welding

Weld 1/2" nut to DOM

Inserted into 1 1/4" x .120 moly tubing

Frame part 2

TIG weld seems

close up

Cutting frame gussets

weld gussets at seems
inside and out
Gusset close up

Monday, November 24, 2008

Frame part 1

Firewall modification for engine
Fabricating frame

Installing frame


Positioning frame

Channeling frame through floor - front view

Floor - rear view

Saturday, November 22, 2008

The Body

Rear view

Driver's side front



Passenger side front

Doors

Inside of front passenger door
and door latch

Inside back passenger door

Door Latches


Rusty door latch



Inner workings



Soap


After soap bath - Inner workings



Complete latch, tack weld covers back on

Reinforcements

Supports for the pillars so the doors will
close square and the car won't move


With no roof, the pillars were floppy
and the doors would open or close

Time to work on the floor


Cross member removal



Removed!